Fiji Project of Printing Plant HVAC Air conditioning and ventilation system
One of the most important design in the printing industry is the reduction of energy consumption without a sacrifice in product quality or delivery. The potential savings are added to the bottom line by decreasing energy consumption. The Fiji project of Printing Plant HVAC takes energy saving into consideration and thus choose air conditioning system with heat energy recovery ventilation.
Project Scale: about 1500 square
Construction Period: about 40 days
Solution:
Color steel plate decoration;
Air conditioning equipment and ventilation system;
Chilled water process pipeline;
Air conditioning equipment electricity;
Air conditioning PLC control
Post time: Nov-27-2019