Airwoods pharmaceutical clean room installation and design team will consider these options at the conceptual stage because different types of clean room design require different disciplines to lead the design and layout process.
Project Scale: about 2,000 square
Construction Period: about 75 days
Solution:
Color steel plate decoration;
Air conditioning equipment and ventilation system;
Compressed Air;
Frozen water;
Pure water process pipeline;
Equipment power and lighting distribution systems, etc