According to the requirements of the Medical Device Production Quality Management Specification Appendices Sterile Medical Devices,the production plant and facilities of the injector syringe need to be completed in the 100,000 class
cleanroom workshop (area) : injection molding, printing, spray silicone oil, assembly, single packing and sealing should ensure that the initial pollution of the product is maintained at a stable level of control.
Project Scale: about 3500 square cleanroom workshop
Construction Period: about 90 days
Solution:
Color steel plate decoration
Air conditioning equipment and ventilation system
Compressed air
Frozen water
Pure water process pipeline
Equipment power and lighting distribution systems, etc.
Post time: Nov-27-2019