Pharmaceutical AHU & Dust Extraction Solution

Project Location

South America

Requirement

Remove dust from workshop

Application

Pharmaceutical AHU & Dust Extraction

Project Background:

Airwoods establish long term strategic relationship with the client. Offer clean room construction material and HVAC solution. The pharmaceutical factory located in Altiplano, a highland plateau with 4058 meters above sea level.

Project Solution

In this project, client’s factory located in Altiplano plateau, the high altitude resulted the AHU’s air pressure decrease. In order to provide sufficient static pressure to overcome the air resistance cause by three filters inside the unit, we selected a fan with a larger air volume and static pressure to ensure that the unit can provide sufficient air volume under high altitude conditions.


Post time: Sep-16-2020

Send your message to us:

Write your message here and send it to us
Leave Your Message