Dominican Morgan Hospital HVAC Solution
Dominican Morgan Hospital HVAC Solution Detail:
Project Location
Santo Domingo, The Dominican Republic
Product
Floor standing heat recovery AHU
Application
Hospital
Key requirement for Hospital HVAC:
Air purified and lower energy consumption of AC
1. Hospital is the most densely public for people who carrying bacteria and viruses, and is considered as the gathering center of pathogenic micro-organisms, so keep on constant Ventilation with air purified is the way to reduce cross infection.
2. The energy consumption of AC systems takes more than 60% of the total energy consumption of the buildings. Fresh air ventilation with heat recovery AHU is an perfect solution to bring purified fresh air and recovery heat from indoor return air.
Project Solution:
1. Provide 11 pieces FAHU, and each of the FAHU equipped with Holtop unique ER paper cross-flow total heat exchanger. Feature of high efficiency heat and moisture transfer rate, fire retardant, anti-bacteria protect people from virus infection and save the running costs of AC.
2. In order to meet the operation model in different area of the hospital, All AHU fan are driven with variable speed motor, so that the hospital BMS integrated all AHU to operate in the needs.
Product detail pictures:
Related Product Guide:
We've been convinced that with joint efforts, the enterprise between us will bring us mutual benefits. We could guarantee you item excellent and aggressive price tag for Dominican Morgan Hospital HVAC Solution , The product will supply to all over the world, such as: Madagascar, luzern, Argentina, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
By Christopher Mabey from Hongkong - 2017.06.29 18:55
Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
By Atalanta from Brunei - 2018.10.01 14:14