2020 Latest Design Mechanical Ventilation Heat Recovery Systems - 2MM Self Leveling Epoxy Floor Paint – Airwoods
2020 Latest Design Mechanical Ventilation Heat Recovery Systems - 2MM Self Leveling Epoxy Floor Paint – Airwoods Detail:
JD-2000 is a two-component solvent-free epoxy floor paint. Nice appearance, dust &corrosion resistant and easy to clean. The flooring system can bond well with the solid base and has good abrasion and wearing resistance. Meanwhile, it has certain toughness, brittle-resistance and can stand a certain weight. The compressive strength and impact resistance ability is also excellent.
Where to Use:
It is mainly used for the non-dusty and non-bacteria areas like food factory, pharmaceutical factory, hospital, precision machinery, electronic factory, etc.
Technical Data:
Drying time: Touch dry: 2 hours Hard dry: 2 days
Compressive strength (Mpa): 68
Impact resistance strength (Kg·cm): 65
Flexural strength (Mpa): 40
Adhesive force grade: 1
Pencil hardness (H): 3
Abrasion resistance(750g/1000r, zero gravity, g)≤0.03
Resistance to engine oil, diesel oil for 60 days: no change.
Resistance to 20% sulfuric acid for 20 days: no change
Resistance to 20% Sodium hydroxide for 30 days: no change
Resistance to toluene, ethanol for 60 days: no change
Service life: 8 years
Recommended Consumption:
Primer: 0.15kg/sqm Undercoat: 0.5kg/sqm+Quartz Powder: 0.25kg/sqm Top coat: 0.8kg/sqm
Application instructions:
1. Surface preparation:Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles, oil, grease, and other contaminants.
2. Primer: Prepare a barrel, pour JD-D10A and JD-D10B in it based on 1:1. Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/㎡.The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours.
Inspection standard for the primer: even film with certain brightness.
3. Undercoat: Mix WTP-MA and WTP-MB based on 5:1 first, then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure.
Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface.
4. Top coat: Mix JD-2000A and JD-2000B according to 5:1 and then apply the mixture with trowel. The consumption quantity is 0.8-1kg/sqm. One coat is enough.
5. Maintenance: 5-7 days. Don’t use or wash with water or other chemicals.
Clean up
Clean tools and equipments first with paper towels, then clean the tools with solvent before the paint hardens
Product detail pictures:
Related Product Guide:
Our purpose is to fulfill our clients by offering golden company, great price and premium quality for 2020 Latest Design Mechanical Ventilation Heat Recovery Systems - 2MM Self Leveling Epoxy Floor Paint – Airwoods , The product will supply to all over the world, such as: Florida, Florence, El Salvador, With the aim of "compete with good quality and develop with creativity" and the service principle of "take customers' demand as orientation", we will earnestly provide qualified products and solutions and good service for domestic and international customers.
By Prudence from Sheffield - 2018.06.12 16:22
We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
By Elaine from India - 2018.09.12 17:18